Developers in PJM have shown strong interest in solar projects, with more than 140 GW of nameplate capacity in the interconnection queue at the end of 2024—far exceeding all other technologies. However, PJM has lagged other regions in bringing solar capacity online, in large part due to slow interconnection study processes and challenging permitting issues. Against a backdrop of anticipated load increases, PJM is pursuing a slew of reforms to accelerate the interconnection of new projects. Moreover, changes in technology and federal policy raise questions about the long-term fundamental outlook for solar in PJM.
During this session, we will cover questions related to the short- and long-term outlook for renewable resources in PJM, with a focus on solar, including: